Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Abeid, J and Arditi, D (2003) Photo-net: an integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(03), 162–71.

Duyshart, B, Walker, D, Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects - the National Museum of Australia project. Engineering, Construction and Architectural Management, 10(03), 179–92.

Luu, D T, Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - an empirical survey. Engineering, Construction and Architectural Management, 10(03), 209–18.

Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(03), 172–8.

Toakley, A R and Marosszeky, M (2003) Towards total project quality - a review of research needs. Engineering, Construction and Architectural Management, 10(03), 219–28.

Wirahadikusumah, R (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(03), 193–208.